‘Major Power Breakdown at Dhabeji Pumping Station; Repair Work Begins’

A major power breakdown at the Dhabeji Pumping Station disrupted the city’s water supply, but repair work is currently underway, according to the Water Board spokesperson.
According to a spokesperson for the Karachi Water Corporation, a major breakdown occurred at the fourth phase of the Dhabeji Pumping Station today at 12:15 pm due to a sudden power outage from K-Electric.
K-Electric officials stated that the breakdown was caused by a cable fault, and repair work has already begun. The spokesperson said that the power interruption led to the shutdown of three pumps at the Dhabeji station, resulting in a shortfall of approximately 54 million gallons of water to the city.
K-Electric management has assured the Water Corporation that the fault will be repaired within the next 18 hours. Meanwhile, Water Corporation officials are in constant contact with K-Electric to ensure the earliest possible restoration of power.
The spokesperson added that once electricity is restored, the pumping system at Dhabeji will return to normal operation.
Read More News On
Catch all the Business News, Breaking News Event and Latest News Updates on The BOL News
Download The BOL News App to get the Daily News Update & Live News.