Lowari Tunnel Project

Lowari Tunnel Project cost risen from Rs 7.98bn in 2004 to Rs 46.04bn in 2022

The cost of the Lowari Tunnel Project has risen to Rs 46 billion, a 475 percent increase above the original PC-I cost approved in 2004. The project’s execution span is 19 years and 2 months (230 months), beginning in 2005 and ending in October 2024. The cost of the Lowari Tunnel Project has risen to Rs 46 billion, a 475

Loading...